Shops, restaurants and offices
A restaurant kitchen, a retail floor and a hotel corridor all dry differently. Hard floors, carpet tile and drywall take different equipment, and food service or guest areas also need cleaning and sign-off before they reopen.
- Carpet tile lifted and dried or replaced.
- Suspended ceiling tile removed where wet.
- Lower drywall opened behind counters.
Plumbing and roof sources are covered on the burst pipe page and the roof leak page.
